By: Justicia Shipena The final drafts of the Distribution Grid and Connection Codes are scheduled for approval in November 2024. These codes aim to establish rules and procedures for the safe, reliable, efficient, and economical operation of Namibia’s distribution network. “We plan to submit…
You must be logged in to continue reading. All articles are 100% FREE for logged in readers.